by jharris.msy@gmail.com | Nov 26, 2017 | Breaking News
The 16 poles that are remaining at Pier 16 from Saturday and Sunday moves will be loaded onto two trucks Monday (beginning around 0700) to the following destinations: 8 Poles – 65′ in length will be moved by one truck to Aguadilla Airport 8 Poles –...
by jharris.msy@gmail.com | Nov 26, 2017 | Breaking News
ETA to San Juan if 1200 hrs on November 28, 2017. Send Pole Distribution Plan to mco@pd-sys.net.
by jharris.msy@gmail.com | Nov 24, 2017 | Breaking News
426 poles received on 11/22, with 1,204 shipped out on the Columbia Baltimore. Total of 5,612 poles on hand as of close of business 11/22/17. Terminal is closed on 11/23-4 and will resume receiving poles on 11/27. Columbia Baltimore ETA San Juan 1200 11/28.
by jharris.msy@gmail.com | Nov 24, 2017 | Breaking News
16 Law Enforcement Escorts have been requested through ESF# 13 and they are working it. Their arrival time at the pier will be 2pm on Friday and 6am Saturday.
by jharris.msy@gmail.com | Nov 24, 2017 | Breaking News
Poles from the Columbia Elizabeth should arrive at the following locations and times: 24 NOV 2017 11 Loads – Canovanas – 4-5pm. 1 Loads – Humacao – 4-5pm. 4 Loads – Ponce – 4-5pm. 25 NOV 2017 2 Loads – Anasco – 9-10am. 5...
by jharris.msy@gmail.com | Nov 24, 2017 | Breaking News
The following wood power poles were loaded today: 1,000 Class 2 45’ (Florida Power and Light) 204 Class 2 50’ Last line was off the dock at 1945 and the barge’s ETA San Juan is 1200 on 11/28, Tuesday.